Below are a few of the recent projects that Saradan Construction has been a part of:
Kroger, Roseville
Complete site work on the 13 acre parcel.
Prestige Cadillac, Warren, MI
7 acres with a 4,000 lineal feet of pipe for detention system alone. Sara Smith worked with the owner’s representative and the engineer to save the owner $75,000 by redesigning the system.
Greenstone Credit Union
Owner was concerned about starting the project in the fall and not being able to get asphalt until spring. We promised that we would have the site ready to pave before winter, and delivered on that promise.
Kroger Fuel Stations
Locations in Waterford, Sterling Heights, Novi, Howell, and Roseville.
Blue Care Network
Southfield – Parking Expansion
Some of the projects that we have done for repeat customers include:
McDonald’s
Locations in Oak Park, Pittsfield Twp., Southfield, Almont, Jackson, Saline, Sterling Heights(2), Clarkston, Flat Rock, Flint, Southgate, Detroit(2), and many more.
Tim Horton’s
Locations in Sterling Heights and Troy.
Kroger
Locations in Rochester Hills, Commerce Twp., Grosse Pointe, St. Clair Shores, Lake Orion, Farmington Hills Fuel, Birmingham, and Brownstown.